Facebook Twitter More...

Thanks to those who were able to join us at the Open House held on November 29. If you were unable to attend, the information from the event is posted under Related Documents on the righthand side of this page. This information will help you learn more about the project and provide your input.

To be considered in the environmental study, comments should be postmarked no later than December 13, 2011. Please send them via email to: trail@langdongroupinc.com or mail them to: Jordan River/Murdock Connector Trail Project Attn: Lucy Park 2875 Decker Lake Drive, STE 575 SLC, UT 84119

Utah County and Lehi City in cooperation with the Utah Department of Transportation, are conducting an environmental study to evaluate the potential impacts of the proposed Jordan River/Murdock Connector Trail from Thanksgiving Way to the Jordan River Parkway Trail in Lehi. This section of trail would provide a continuous connection to regional and local trail systems.

For more information and to provide your input, click on the links to the right.

Documents

Northern Utah County Trails

Project Information